China2EU cases

45 containers for a hotel and restaurant complex

Complete furnishing of new hospitality properties in the Kyiv region — from manufacturer sourcing and custom design to loading control and international logistics.

The brief

Complete turnkey fit-out.

A private client approached China2EU at the end of November. By early December, every order had been placed into production. The project combined major scale, custom design, and an exceptionally tight deadline before China’s holiday period.

Delivery pace

A compressed timeline.

The team synchronized production, inspections, and container availability to avoid losing time before Chinese New Year.

China2EU responsibility

One team — the entire cycle

We did not take responsibility for a single stage — we coordinated the entire project from the first request to the handover of every container.

  • Supplier search and selection
  • Ordering and production coordination
  • Inspection and quality control
  • Loading supervision
  • International logistics and handover

Result

45 out of 45 delivered

The project was completed in full. Across the entire shipment, only two chairs were damaged — most likely during transport or unloading. All other goods arrived without issue and were used to equip the new properties.

Four flagship smart homes for a project in Sardinia

A major delivery from China to Italy — from supplier selection and specification to quality control, international logistics and post-arrival support.

Project scale

Four flagship homes — one coordinated route.

China2EU selected the right manufacturer for the client's brief and budget, aligned the specifications of four large-format modules and coordinated the complete route from production in China to delivery in Sardinia.

A fit-out with no blind spots

One module — multiple factories.

Kitchens, furniture, sanitaryware and lighting are often produced separately from the module. We selected a manufacturer to match the budget and brief, then helped assemble the complete specification.

China2EU scope

From the first request — to post-delivery support

We built a safe first-purchase process and remained available after delivery.

  • Supplier search and selection
  • Specification of four homes
  • Production coordination
  • Quality control and logistics
  • Post-arrival support

Post-arrival support

Under control — even after delivery.

When one module required an additional assessment after transport, the team quickly coordinated the inspection, documentation and communication with the carrier and insurer. We stayed involved until the matter was fully resolved.

Result

Four homes delivered. The next are already underway.

The major Sardinia project was delivered: four flagship smart homes travelled from production in China to Italy under China2EU coordination. The client continued the partnership, and the team is already supporting the next orders.

A playground for a residential complex complete delivery

A fully bespoke playground designed and delivered from scratch in Odesa.

Request

Request

In 2025, we began work on one of the most complex projects in our practice: creating a fully bespoke children's play complex for a residential development in Odesa.

Delivery

Delivery

The playground was developed from scratch around the client's requirements and safety standards.

We selected and visited the best factories capable of manufacturing the required structures. Every structure, play element and design detail was developed individually, without standard factory solutions.

After production, all goods were loaded into containers and shipped by sea to Ukraine.

For the on-site installation, we sent three Chinese engineers who worked alongside Ukrainian engineers to assemble the playground within the residential complex.

Result

Result

By the end of 2025, the bespoke playground had been fully installed and handed over to the client.

China2EU managed the project from the first sketch through on-site technical delivery. The project was completed successfully.